Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160412
    Date de publication: 24 juillet 2018

    Promoteur – Intermédiaire Financier

    CAMARA MUNICIPAL DE LISBOA

    Lieu

    Description

    Upgrade the drainage network of Lisbon, including drainage tunnels and ancillary infrastructure to reduce the frequency and magnitude of floods in the city.

    Objectifs

    Lisbon has been suffering from intense and more frequent flood events in the past years. These events not only negatively affect the tourism industry, but more importantly, cause long lasting detrimental effects to the city population, as well as to its property and heritage. The project is intended to minimize the recurring and increasing problem of flooding while increasing infrastructure resilience in specific vulnerable areas of the City of Lisbon, including parts of the historical city centre. The project is part of the Lisbon's Drainage Master Plan 2016-2030, which includes recommendations regarding a number of structural interventions in the city.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 65 million

    Coût total (montant approximatif)

    EUR 134 million

    Aspects environnementaux

    The project will deliver substantial environmental quality improvements, notably in the form of increased resilience against damages from high intensity floods. Some project components fall under Annex II of the Environmental Impact Assessment EIA Directive 2011/92/EU, which has been transposed into Portugal's legislation (Decreto Lei n.º 151-B/2013.) The competent authority, namely the Portuguese Environment Agency (APA), has issued the approvals for the Titulo Unico Ambiental (TUA) and the Declaracao de Impacto Ambiental (DIA).

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/24/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Approuvé - 18/09/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Portugal Eau, assainissement