Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160408
    Date de publication: 14 septembre 2016

    Promoteur – Intermédiaire Financier

    A2A SPA

    Lieu

    Description

    Investments in district heating networks

    Objectifs

    The proposed operation is part of the promoter's 2016-2020 investment programme. It concerns the optimisation, upgrade and extension of the district heating network in the Milan, Brescia and Bergamo metropolitan areas, the development of new capacity to replace more polluting and aging assets. It encompasses a large number of components including new generation capacity, heat storage units, distribution networks, substations, and remote control systems.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 123 million

    Aspects environnementaux

    All project schemes fall under Annex II of the Environmental Impact Assessment (EIA) Directive and none of them are expected to require EIA based on their technical characteristics. During appraisal, the Bank will assess the environmental and social risks of the project and compliance with applicable EU environmental policy and regulation. This includes review of environmental permitting and related environmental management processes, including any potential effects on nature conservation sites and protected areas of cultural heritage.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project are tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and 2004/17/EC as well as Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 29/11/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Italie Énergie