Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160172
    Date de publication: 14 avril 2016

    Promoteur – Intermédiaire Financier

    ESPOON KAUPUNKI

    Lieu

    Description

    The project comprises the construction of new schools and daycare centres and the refurbishment and/or extension of existing schools.

    Objectifs

    The project supports the implementation of the city of Espoo's education strategy and comprises the construction of four new pre-schools/daycare centres (of which one will be open 24/7) and three new comprehensive schools, the extensions of three school campuses and the refurbishment of one comprehensive and one upper secondary school in Espoo over the period 2016-2020.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 140 million

    Coût total (montant approximatif)

    EUR 358 million

    Aspects environnementaux

    Schools are not specifically mentioned in Directive 2011/92/EU on environmental impact assessment (EIA), though the project may be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal the screening decision of the competent authority and whether an EIA is required. It is expected that the project will have positive social benefits as education is an element of social cohesion.

    The public buildings will be required to at least meet the minimum national targets concerning energy efficiency. The design energy performance of the schools and any specific related targets to be met will be verified during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 9/06/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Finlande Éducation