    Référence: 20160053
    Date de publication: 30 mai 2016

    Promoteur – Intermédiaire Financier

    DOLOMITI ENERGIA HOLDING SPA

    Lieu

    Description

    Investments in the modernisation, upgrade and development of the electricity and gas distribution networks, as well as small hydropower facilities in the autonomous province of Trento over the period 2017-2020

    Objectifs

    The overall purpose of the programme is to modernise the electricity and gas networks, as well as small hydropower facilities, in order to secure the electricity supply, the quality of the service and to cater for new system user.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 180 million

    Aspects environnementaux

    The project will concern the implementation of electricity distribution schemes, some of which may require the competent national authority to determine the need for an environmental impact assessment (EIA). For electricity distribution, the main impact that can be typically expected for the programme relates to noise nuisance and disturbance during construction, vegetation clearance, visual impact, and electromagnetic fields, as well as on flying vertebrates. For gas projects and hydropower projects, the environmental impact is expected to be low.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 22/10/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).