    Référence: 20160014
    Date de publication: 6 avril 2016

    Promoteur – Intermédiaire Financier

    MINISTRY OF INFRASTRUCTURE AND DEVELOPMENT / GDDKIA

    Lieu

    Description

    Upgrading of about 40 km of the S7 express road between Koszwaly and Kazimierzowo in Northern Poland

    Objectifs

    The project concerns the construction of a 40 km long 2 x 2 lane expressway with 12 metre median reserved for an additional lane, partially following the existing and partially along a new alignment in two northern voivodships of Poland - Pomeranian and Warminsko-Mazurskie. It is part of the S7 road linking Gdansk with Warsaw and further continuing south to Krakow and Slovakia. The project will facilitate the passage of long distance as well as regional traffic between Gdansk region and Warsaw and will improve traffic conditions on a heavily congested section between Gdansk and Elblag. The project includes 4 interchanges, more than 70 engineering structures, including 2 bridges over the Vistula river, as well as 26 animal passes. The project will complement the investments made so far on S7 road sections.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 240 million

    Coût total (montant approximatif)

    EUR 680 million

    Aspects environnementaux

    The project falls under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring a full EIA procedure. The project crosses the Natura 2000 site Dolina Dolnej Wisly (PLB040003). Therefore, the provisions of the Habitats Directive (92/43/EEC, as amended) and Birds Directive (2009/147/EC) apply. The investments are included in the national road construction programme and the current operational programme infrastructure and environment, both of which were subject to a form of strategic environmental assessment. The procedures and outcomes of the environmental assessment are to be further reviewed during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 19/11/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports