Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150683
    Date de publication: 16 février 2016

    Promoteur – Intermédiaire Financier

    GLAS CYMRU CYFYNGEDIG

    Lieu

    Description

    The programme forms part of Welsh Water's capital expenditure programme for the regulatory period 2015-20 (AMP6). The individual schemes are located throughout the entire service area. The programme is mainly driven by EU directives as applicable to the water and wastewater sector as well as resource efficiency and adaptation of the systems and infrastructures to climate change and demographic growth.

    Objectifs

    The project comprises improvements to water supply and wastewater collection and treatment as part of the promoter's regulatory investment programme AMP 6 (Asset Management Plan 6). The AMP 6 Programme was approved by the economic regulator OFWAT in 2014 in order to support compliance with EU directives and stricter standards.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 324 million (GBP 250 million)

    Coût total (montant approximatif)

    EUR 777 million (GBP 600 million)

    Aspects environnementaux

    The programme includes improvements to water supply and wastewater collection and treatment as part of the promoter's regulatory investment programme AMP6 to support maintenance and improvement of compliance with the Water Framework Directive (2000/60/EC) and the Urban Waste Water Treatment Directive (91/271/EEC). Compliance with the EU and national environmental legislation and procedures will be examined during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC , or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 20/01/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Eau, assainissement