Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150567
    Date de publication: 8 février 2016

    Promoteur – Intermédiaire Financier

    MIROVA

    Lieu

    Description

    Co-investment in an onshore wind farm with a capacity of 23.1 MW.

    Objectifs

    The project concerns a ready-to-build onshore wind farm in Sweden. The project will contribute to meeting the EU and Swedish targets for energy generated from renewable energy sources.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 12 million

    Coût total (montant approximatif)

    EUR 27 million

    Aspects environnementaux

    A comprehensive Environmental Impact Assessment (EIA) has been conducted and the fund manager will be required to obtain the non-technical summary of it, and, where relevant, written confirmation from the competent authority that the investment will not have any significant negative impact on sites of nature conservation. The project will generate positive environmental impacts, notably by reducing Greenhouse Gas emissions. The potential negative environmental impacts of the project are mainly limited to the construction phase. Related conditions are included in the environmental permit and the construction planning takes these conditions into account.

    Passation des marchés

    The fund's investment guidelines will be required to ensure that procurement procedures applied by the underlying investments financed by the fund are in line with the provisions of the relevant directives. In this case, the promoter is a private company not operating in the utilities sector and not having a status of a contracting authority. Thus, it is not covered by the EU directives on procurement.

    Statut

    Signé - 25/02/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Suède Énergie