    The project consists of the construction and operation of: (i) a desalination plant in the Gulf of Aqaba producing 65 million cubic meters (MCM)/year of desalinated water for Aqaba, Jordan and Eilat, Israel; (ii) a brine and seawater pipeline linking the Red Sea with the Dead Sea discharging 235 MCM/year of brine and seawater to the Dead Sea; and (iii) hydropower plants on the brine and seawater pipeline.

    Objectifs

    The objective of the project is to have an improved water supply in the Aqaba (Jordan) and Eilat (Israel) regions by 2021 and at the same time to slow down the decline of the Dead Sea.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 260 million

    Coût total (montant approximatif)

    EUR 1026 million

    Aspects environnementaux

    An environmental and social impact assessment has already been carried out under the World Bank's supervision. The EIB is carrying out a full update of this Environmental and Social Impact Assessment through Technical Assistance (TA) to identify remaining gaps and ensure the ESIA and Environmental and Social Management Plans comply with EIB standards and safeguards.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 3/10/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Jordanie Eau, assainissement