Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150531
    Date de publication: 13 octobre 2015

    Promoteur – Intermédiaire Financier

    BANCO SANTANDER SA

    Lieu

    Description

    Framework loan dedicated to finance energy-efficiency schemes in hotels in Spain, as part of the Private Finance for Energy Efficiency (PF4EE) programme.

    Objectifs

    The project targets the financing of energy efficiency and small renewable energy investments mainly in existing hotels and, to a lesser extent, in other buildings for tourist accommodation, all located in Spain. The investments involve a variety of measures such as improvements to the building envelope, heating and cooling systems, energy-efficient lighting, energy-management systems, solar heaters, etc.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 67 million

    Aspects environnementaux

    This operation intends to bring environmental benefits by supporting projects that reduce energy consumption and help to mitigate climate change. The individual schemes to be financed are likely to be small and are expected to have a very limited negative environmental impact. Given the scale, location and nature of the sub-projects, an environmental impact assessment (EIA), as defined in the EIA Directive (2011/92/EU), is not expected to be required.
    The Bank will assess the capacity and procedures of the financial intermediary to ensure compliance with national and European environmental and biodiversity regulations of the individual schemes, as well as its capacity to support the Bank's public disclosure policy, which aims at facilitating access by the public to environmentally relevant information.

    Passation des marchés

    The promoters of the underlying sub-projects are private companies not operating in the utilities sector and not having the status of a contracting entity, and thus are not subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that a sub-scheme is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the financial intermediary to ensure that contracts for the implementation of the sub-project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 26/11/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Énergie Industrie