Date de publication: 3 octobre 2016
Promoteur – Intermédiaire Financier
ELENIA OYLieu
Description
The project concerns a replacement programme focused on improving security of power supply for electricity networks in central Finland. The project includes the refurbishment of ageing medium and low-voltage network infrastructure and investments to weather-proof and increase storm resilience of the network, and to improve power quality.
Objectifs
Distribution network modernisation and modification to increase security of electricity supply
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 150 million
Coût total (montant approximatif)
EUR 333 million
Aspects environnementaux
The project includes some facilities that fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), which requires the competent national authority to determine the need for an EIA. The impact that can be typically expected for some schemes relate to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction. Medium voltage (MV) and low voltage (LV) schemes are normally expected to have minimal or no environmental impact. According to the promoter, an environmental study could be required, but for this type of investments the promoter has never conducted a full EIA study. The appraisal will focus on the promoter's environmental capacity and work procedures.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Statut
Signé - 21/12/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).