Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150313
    Date de publication: 29 mars 2016

    Promoteur – Intermédiaire Financier

    REPUBLIC OF SLOVENIA

    Lieu

    Description

    Installation of GSM-R digital radio communication system on the entire public railway infrastructure network of the Republic of Slovenia

    Objectifs

    The project concerns the installation of a GSM-R system on essentially the entire public railway infrastructure network of the Republic of Slovenia (approximately 960 km). The EU technical specifications of interoperability specify the use of a GSM-R system as the telecommunication component of the European Rail Traffic Management System (ERTMS). With GSM-R, trans-border interoperability and reliability of telecommunications are enhanced, security systems can be interconnected, operational safety is increased through better communication management, and other devices can be installed that enhance the attractiveness of rail travel (electronic ticketing, passenger information systems, Wi-Fi, etc.).

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 24 million

    Coût total (montant approximatif)

    EUR 124 million

    Aspects environnementaux

    All environmental issues have been adequately addressed. Works fall outside the scope of the Environmental Impact Assessment (EIA) Directive (2011/92/EU). Even though EIA was not mandatory for the project, the promoter undertook a non-statutory EIA. Some parts of the project are located in or close to Natura 2000 sites; the competent authorities stated that no significant adverse impact is expected.

    Passation des marchés

    Procurement of the main contracts has been finalised. The promoter is subject to and has followed EU procurement procedures including publication in the Official Journal of the EU. Under these conditions, the procurement procedures followed by the promoter are suitable for the project and acceptable to the Bank.

    Statut

    Approuvé - 23/11/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Transports