Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20150081
Date de publication: 8 mars 2016

Promoteur – Intermédiaire Financier

TRAMWAJE WARSZAWSKIE SP ZOO

Lieu

Description

Construction of new tramway lines in the city of Warsaw and purchase of tramway rolling stock

Objectifs

The project consists of tram infrastructure construction and upgrading throughout Warsaw, including construction of 5 new sections of tram lines (total length 20 km), construction of a new tram depot for 150 trams, modernisation of 6 sections of existing tram lines (total length 22 km), acquisition of new tram units rolling stock for operation on the new sections of tramway lines and up to 40 tram units to replace obsolete rolling stock. The new sections of tramway lines will partly replace existing bus services. All of the infrastructure schemes are located in Warsaw. Most schemes are small or of medium size, and there are 4 large schemes (above EUR 50M). A significant part of the project is expected to be funded by the EU (Cohesion Fund).

Secteur(s)

Montant BEI envisagé (montant approximatif)

PLN 572 million (EUR 132 million)

Coût total (montant approximatif)

PLN 1551 million (EUR 358 million)

Aspects environnementaux

Construction of new tram lines may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. Should any scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned directives, as transposed into national law.

Passation des marchés

The promoter, as a public administration entity, is required to follow EU public procurement rules (2004/17/EC and 2007/18/EC) as implemented by national law, including publication of contract notices in the Official Journal of the EU, if and where appropriate.

Statut

Signé - 14/12/2016

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Pologne Transports