Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150056
    Date de publication: 13 juillet 2015

    Promoteur – Intermédiaire Financier

    MINISTERIO DE SALUD

    Lieu

    Description

    The project will improve the environmental conditions of Panama City and Bay by doubling the current treatment capacity of 190 000 cubic meters per day of the Juan Díaz Wastewater Treatment Plant.

    Objectifs

    This project is the main component of the second phase of the Panama City and Bay Sanitation Programme, which will continue to contribute to the Panama Government's efforts to increase the country's pollution abatement and environmental sustainability. It will treat the wastewater produced by approximately 400 000 people, which is currently discharged into rivers and into Panama Bay without any treatment. It will also indirectly have a positive economic impact on the metropolitan area of Panama. The project is in line with the EIB Water Sector Lending Policy and it also complies with the External Mandate for EIB activity in Asia and Latin America through the development of social and economic infrastructure.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 44 million (USD 50 million)

    Coût total (montant approximatif)

    EUR 138 million (USD 157 million)

    Aspects environnementaux

    The project will have a very positive environmental and social impact for the population of Panama City. It will significantly reduce wastewater direct discharges into rivers and into the bay thus contributing to improving public health and environmental conditions in the beneficiary area. The project's compliance with environmental and social principles of the EU, the EIB and the other IFIs, together with the applicable national environmental legislation and issues related to adaptation to climate change will be verified during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that the procurement of the project is carried out in line with EIB procurement guidelines.

    Statut

    Signé - 28/01/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Panama Eau, assainissement