    Référence: 20150042
    Date de publication: 4 juin 2015

    Promoteur – Intermédiaire Financier

    Hungary represented by the Ministry for National Development

    Lieu

    Description

    GSM-R radio network system is planned to be implemented along 935 km of the main railway lines, consisting of the main international corridors and other TEN-T lines (Phase 1 of GSM-R implementation on the Hungarian railway network). The project consists of procurement and commissioning of the required fixed and mobile equipment, including assembly, system integration, training, start-up, and operational and maintenance support.

    Objectifs

    The project contributes to the objective of promoting sustainable transport on the TEN-T core and comprehensive networks, with an expected increase in rail usage thanks to a shift from road to railways.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    HUF 3300 million (EUR 11 million)

    Coût total (montant approximatif)

    HUF 22100 million (EUR 72 million)

    Aspects environnementaux

    The investments are part of the transport operational programme 2007-2013, which underwent a strategic environmental assessment (SEA) procedure and the environmental effects were assessed. Given the nature of the project, it falls under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) and the need for an EIA must be verified at allocation stage. For this major project, a preliminary environmental impact assessment was performed. On the basis of the findings of this assessment, the competent authorities decided to screen out the implementation of the GSM-R system project from completing a full EIA procedure. The environmental permit has been issued for this project, which is not expected to have any impact on Natura 2000 sites.

    Passation des marchés

    The promoter is a public company obliged to comply with European and national public procurement legislation. All of the works and services related to the implementation of the project have already been procured accordingly. The construction works and associated supervision were procured by the promoter in accordance with Directive 2004/18/EC. All the bid notices for construction and services were published in the Official Journal of the European Union (OJEU) and all the contracts have been awarded and signed.

    Statut

    Approuvé - 31/10/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).