Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150041
    Date de publication: 15 juin 2015

    Promoteur – Intermédiaire Financier

    Hungary represented by the Ministery for National Development

    Lieu

    Description

    The railway section Szajol-Püspökladány is part of the main line No. 100 Budapest-Szolnok-Debrecen-Nyíregyháza-Záhony (transhipment facility at the Slovak/Ukrainian border). The project mainly concerns the rehabilitation of the existing double track (67.15 km) and the renewal of the catenary and of the signalling and telecommunications equipment.

    Objectifs

    The project contributes to the objective of promoting sustainable transport on the TEN-T core and comprehensive networks, with an expected increase in rail usage thanks to a shift from road to railways.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    HUF 18700 million (EUR 61 million)

    Coût total (montant approximatif)

    HUF 125300 million (EUR 406 million)

    Aspects environnementaux

    The investments are part of the transport operational programme 2007-2013, which underwent an SEA procedure and the environmental effects were assessed. Given the nature of the project, it falls under Annex II of the EIA Directive (2011/92/EU) and the need for an EIA must be verified at the time of allocation. For this major project, a preliminary environmental impact assessment was performed. On the basis of the findings of this assessment, the competent authorities require a full EIA for the Szajol-Püspökladány reconstruction. The environmental permit has been issued for the project, which is not expected to have any impact on Natura 2000 sites.

    Passation des marchés

    The promoter is a public company obliged to comply with European and national public procurement legislation. All of the works and services related to the implementation of the project have already been procured accordingly. The construction works and associated supervision were procured by the promoter in accordance with Directive 2004/18/EC. All tender notices for construction and services were published in the Official Journal of the European Union (OJEU) and all the contracts have been awarded.

    Statut

    Approuvé - 31/10/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Hongrie Transports