Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150017
    Date de publication: 3 juin 2015

    Promoteur – Intermédiaire Financier

    Special purpose company to be established and owned by the municipality of Yerevan

    Lieu

    Description

    The project will comprise the construction of a new sanitary landfill that will have a total life in excess of 25 years. If deemed feasible, the project will also comprise some recycling and composting facilities and related equipment.

    Objectifs

    The project will support improvements in the municipal solid waste sector in Yerevan, the capital of Armenia. Today, some 1,000 tonnes/day of municipal waste are disposed of at the existing landfill, which does not meet basic environmental and sanitary standards and is nearing its capacity. The new sanitary landfill will serve the city of Yerevan with a population of 1,100,000 inhabitants and will reduce adverse environmental, health and climate impact from the current landfill, which will be closed and rehabilitated when the new site becomes operational.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    • Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 10 million

    Coût total (montant approximatif)

    EUR 35 million

    Aspects environnementaux

    The project is expected to result in an overall improvement in the environment and public health by improving waste disposal services for the city of Yerevan. The project will also contribute to the mitigation of climate change by reducing emission of greenhouse gases from the current unsanitary landfill. A full environmental impact assessment (EIA) is required and will be published on the Bank's website. The closure of the existing landfill will affect people involved in the collection of secondary materials on the landfill site. Appropriate livelihood restoration plans will have to be developed and implemented.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 16/10/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Arménie Déchets solides