Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140620
    Date de publication: 5 février 2015

    Promoteur – Intermédiaire Financier

    VITENS NV

    Lieu

    Description

    The project concerns the 2015-2019 investment programme into the production and distribution facilities of Vitens, the largest water supply company in the Netherlands. The programme consists mainly of the renewal and upgrading of water treatment plants, reservoirs and pumping stations, distribution networks, water meters, and operational support infrastructure such as SCADA systems, security and offices.

    Objectifs

    The project will secure or enhance the quality of life to up to 5.5 million residents in the provinces of Flevoland, Friesland, Gelderland, Utrecht and Overijssel by improving the quality and reliability of the drinking water supply and by improving resource efficiency. The project allows for continued compliance with the Water Framework Directive (2000/60/EC) and the Drinking Water Directive (98/83/EC) and national norms.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million

    Coût total (montant approximatif)

    EUR 600 million

    Aspects environnementaux

    The investment programme is geared toward securing a sustainable management of water supply and distribution, bringing about a positive social and environmental impact. The upgrade of pumping stations and other network and process optimisation measures are examples of components with environmental/resource efficiency impacts. Compliance with EU and national environmental legislation will be verified during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 16/09/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays-Bas Eau, assainissement