    Référence: 20140374
    Date de publication: 9 décembre 2014

    Promoteur – Intermédiaire Financier

    HIGH-VOLTAGE ELECTRIC NETWORKS CJSC

    Lieu

    Description

    The project consists of an electricity transmission line and a High Voltage Direct Current (HVDC) station that form an interconnection link between Armenia and Georgia. The link will allow continuous energy trade between the two countries, and in particular will allow Armenia to better access regional and European markets. The link will improve security of electricity supply in both participating countries.

    Objectifs

    The project aims at providing a safe and economically efficient coverage of the growing electricity demand in both countries. Increasing energy security, in particular in Armenia, will contribute to economic development and provision of basic services to the population. By providing access to efficient electricity production and enabling the replacing of thermal power by hydropower (from Georgia), it also contributes to environmental and climate protection. One of its main objectives is to establish better energy interconnections by closing a missing link for a reliable, flexible and mutually beneficial cross-border energy exchange not only between Armenia and Georgia, but within the South Caucasus. The project will also introduce EU standards as it will allow the connection of Armenia (via Georgia) to the EU network (European Network of Transmission Systems Operators for Electricity - ENTSO-E). This project will foster regional integration, which is a strategic objective under the External Lending Mandate.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 10 million

    Coût total (montant approximatif)

    EUR 113 million

    Aspects environnementaux

    An environmental and social impact assessment will be carried out fully in compliance with the Environmental Impact Assessment (EIA) Directive, including the identification and implementation of compensation and mitigation measures.

    Passation des marchés

    The contracts are expected to be procured by the promoter in accordance with KfW procurement rules and procedures, and in compliance with the requirements and standards agreed between EIB and KfW for projects under the Mutual Reliance Initiative for operations outside the EU, as foreseen in the Bank's Guide to Procurement. In particular, calls for international tenders will be published in the Official Journal of the EU in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 16/03/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Arménie Énergie