Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20140301
    Date de publication: 29 septembre 2014

    Promoteur – Intermédiaire Financier

    TURKIYE KALKINMA BANKASI AS

    Lieu

    Description

    The loan will finance small to medium-sized investments in Turkey in the fields of renewable energy and energy efficiency, as well as projects that substantially increase the environmental performance of industrial processes.

    Objectifs

    The project will help Turkey achieve its sustainability goals in the field of energy. Moreover, improving energy efficiency and supporting renewable energy investments will contribute to reducing atmospheric pollution, including greenhouse gas emissions.

    Commentaires

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    • Industrie - Industrie manufacturière

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 400 million

    Aspects environnementaux

    The individual schemes to be financed will typically be small and are expected to have limited negative environmental impacts. However, some projects may fall under Annex II of the Environmental Impact Assessment (EIA) Directive, requiring a screening decision by the competent authority on the need to carry out an EIA. The Bank will require that under the proposed facility the financial intermediary finances projects that are in compliance with national law and with the principles of EU environmental laws, with particular reference to impacts on biodiversity and cumulative impacts.

    Passation des marchés

    The Bank will require the financial intermediary to ensure that, where applicable, procurement procedures conducted by the promoters of the sub-projects are in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 9/12/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Turquie Énergie Eau, assainissement Industrie