    Référence: 20140150
    Date de publication: 22 avril 2015

    Promoteur – Intermédiaire Financier

    Ministry of Water and Irrigation

    Lieu

    Description

    The project is located in the northwest of Jordan and involves the abstraction and treatment of 30 million cubic metres per year of water from the King Abdullah Canal (KAC) to supply the Zabda Reservoir in the City of Irbid (80km north of Amman). Its main components include the construction of an intake facility from the KAC, a treatment plant, pumping facilities and a transmission pipeline to convey the treated water from the treatment plant to the Zabda Reservoir on the western side of the City of Irbid.

    Objectifs

    The project responds to a pressing need in the Northern Governorates, which suffer from a significant water deficit, with added pressure from the influx of Syrian refugees. By bringing new water supply to the Northern Governorates, the project also addresses the area's vulnerability to climate change. The project forms part of the national water strategy aimed at optimising water distribution across the country.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    USD 70 million (EUR 64 million)

    Coût total (montant approximatif)

    USD 112 million (EUR 102 million)

    Aspects environnementaux

    An environmental impact assessment (EIA) including public consultation is required under Jordanian legislation and will be carried out taking into account where possible the relevant EU environmental and social principles, standards and practices. The EIA will be submitted to the Bank for publication on its website. Proximity to protected areas shall also be verified during the EIA. An environmental and social management plan (ESMP) will be prepared alongside the EIA and operationalise required mitigation measures. The Bank will verify the acceptability of the operation in terms of likely environmental and/or social impacts and proposed mitigation and compensation measures.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Signé - 8/11/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Jordanie Eau, assainissement