Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20130656
Date de publication: 3 octobre 2017

Promoteur – Intermédiaire Financier

ATTIKO METRO SINGLE MEMBER SA

Lieu

Description

The project will finance the acquisition of new rolling stock, design and construction of phase A of the new metro line 4 of the Athens metro system, which connects Alsos Veikou and Goudi. Line 4 will have strong linkages with other lines of the Athens Metro network and include five transfer stations to the existing Lines 1, 2 & 3. It herefore it is expected that Line 4 will help to reduce congestion in other Metro stations.

Objectifs

This new section of the Athens Metro will provide connection to many important facilities, such as hospitals, universities and their campuses, the courts area, regions with increased professional and commercial services, serving new residential areas and significantly reduce travel time to the city center. It is anticipated that the project will upgrade significantly the quality level of life in urban areas through reduction of noise levels and environmental pollution.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 730 million

Coût total (montant approximatif)

EUR 1706 million

Aspects environnementaux

The project falls under annex II of the Environmental Impact Assessment (EIA) directive and has been screened in by the Competent Authority. An environmental impact statement (EIS) has been completed and has been published for public consultation. The promoter expects to obtain the environmental permit at the end of 2017. The project is constructed inside the built-up area of Athens, and no significant impact on nature conservation areas is expected.

Passation des marchés

The promoter has to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2014/24/EU or 2014/25/EU and Dir. 2007/66/EC), with publication of tender notices in the Official Journal of the EU (OJEU), as and where appropriate.

Statut

Signé - 14/06/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Grèce Transports