    The project consists of a dual-fuel (natural gas with light fuel oil as backup fuel) reciprocating engine power plant. The plant is situated in the south-western outskirts of Tallinn, adjacent to an existing large 330 kV switching station into which it feeds the electricity.

    Objectifs

    The project is securing the supply of electricity in cases of high voltage network, large power plant or import connection disturbances, provide network services like spinning reserve and reactive power in efficient way, and is as well capable to autonomously start the electricity system of the country (“black start”) after any major incident.

    Commentaires

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 32 million

    Coût total (montant approximatif)

    EUR 83 million

    Aspects environnementaux

    The plant falls under Annex 1 of EIA Directive 2011/92/EU and has been subject to an EIA process. Main environmental impacts of gas fired power plants are typically NOx and CO2 emissions into the air. Modern gas/dual fuel engines are capable to be operated under applicable emission limits.

    Passation des marchés

    The Bank will require Elering to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/17/EC and 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required. The procurement notice of the main engine delivery was published in the Official Journal of the European Union on 6th of October 2010.

    Statut

    Signé - 11/06/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Estonie Énergie