Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130454
    Date de publication: 6 mars 2014

    Promoteur – Intermédiaire Financier

    RS Ministry of Transport Agency

    Lieu

    Description

    The project includes reconstruction, electrification and upgrading of the railway line Pragersko-Hodos for 160 km/h, part of the TEN-T Priority Project No. 6 Lyon-Trieste-Divaca/Koper-Divaca-Ljubljana-Budapest-Ukraine border. It includes Phase I entailing most of the works and Phase II encompassing the improvement of level crossing along the line.

    Objectifs

    The project contributes to the objective of promoting sustainable transport, as increased rail usage with a shift from road will reduce road traffic emissions and road traffic accidents. In particular, it will improve the quality and competitiveness of cargo transport by rail, reduce travel times for passenger rail services, develop interoperability of railways, increase safety and minimise environmental impact. The project will also promote EU objectives on economic and social cohesion as it is located in a convergence area.

    Commentaires

    None.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 170 million

    Coût total (montant approximatif)

    EUR 401 million

    Aspects environnementaux

    Phase I falls under Annex I of the EU EIA Directive (2011/92/EU). Phase I was subject to an Environmental Impact Assessment for which the Environmental Protection Consent was granted by the competent authority (CA) in October 2012. With regard to Phase II, the CA issued a Statement (which can be considered a screening-out opinion) in January 2013. In May 2013, the CA issued a Screening Proforma together with a document explaining the decision in accordance with criteria of Annex II of the EU EIA Directive. The project will contribute to reducing noise emissions and air pollution as a modal shift from road to rail is expected. Compliance with environmental and nature protection directives and procedures and status of environmental permits will be checked during appraisal.

    Passation des marchés

    The Promoter is subject to public procurement rules according to EU regulations. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC or 2004/17/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Approuvé - 20/03/2015

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Transports