Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130421
    Date de publication: 12 novembre 2013

    Promoteur – Intermédiaire Financier

    Municipality of Ulaanbaatar

    Lieu

    Description

    Financing of the water, wastewater and sanitation investment programme in the Ger areas of the municipality of Ulaanbaatar (Mongolia). The programme is part of an overall priority urban services development project identified and prepared by the Asian Development Bank (ADB).

    Objectifs

    The water and sanitation component will have an important developmental impact, leading to a 25% increase in the access to water supply and sanitation in urban areas (related to MDG target n°7). Additionally, the water safety plan developed by the World Health Organisation shall be implemented.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    • Transports - Transports et entreposage

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 313 million

    Aspects environnementaux

    The project will benefit the environment and public health, by providing better drinking water to the population, improving the efficiency of treatment and distribution facilities and by collecting and treating waste water. A general Environmental Impact Assessment (EIA) has been approved by the competent authority. Detailed EIAs for the sub-centers are currently in preparation. In addition, an Initial Environmental Examination and an Environmental Assessment and Review Framework have been prepared. Public consultations were held during project preparation and are foreseen during implementation. An Environmental Management Plan has been prepared. A Land Acquisition and Resettlement Plan has been prepared, in line with national legislation and ADB's Safeguard Policy Statement, which are acceptable to EIB.

    Passation des marchés

    Procurement will be carried out according to ADB guidelines, supplemented with additional conditions to also comply with the Bank's Guide to Procurement requiring the Promoter to ensure that any procurement procedures are done also in accordance with the relevant EU public procurement rules.

    Statut

    Signé - 30/06/2014

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Mongolie Énergie Eau, assainissement Transports