Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130185
    Date de publication: 5 septembre 2013

    Promoteur – Intermédiaire Financier

    Sächsische Aufbaubank

    Lieu

    Description

    Framework Loan to support public municipal infrastructure focusing on urban renewal and regeneration of the city centres, including cultural heritage, housing and energy efficiency.

    Objectifs

    The EIB loan, implementation planned for the 2013-2017 period, will complement the EU- and national grant programmes carried out by Sächsische Aufbaubank (SAB) and dedicated to public beneficiaries in Saxony, which is classified as a Convergence region.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 626 million

    Aspects environnementaux

    All schemes should have an overall positive impact on the environment in the urban areas. However, some of the schemes may fall under Annex II of the 2011/92/EU Directive and thus might be subject to an environmental assessment. Should any such scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned Directives as transposed into the national law. All schemes must be implemented in compliance with the EU environmental legislation.

    Passation des marchés

    In case of public beneficiaries, the Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC/ or 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 3/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Infrastructure composite