Recherche Fr menu ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20130068
    Date de publication: 6 mai 2014

    Promoteur – Intermédiaire Financier

    The Kingdom of Spain, through its Ministry of Public Works and Transport ("Fomento").

    Lieu

    Description

    The project concerns the implementation of an interoperable dual gauge railway line along the Spanish Mediterranean coast from Castellbisbal (Barcelona) to Almussafes (Valencia), and the construction of a connection with the high-speed line Madrid-Barcelona-French border.

    Objectifs

    The project aims at ensuring railway interoperability for rail traffic between the French border and Algeciras in southern Spain along the Spanish Mediterranean coast.

    Commentaires

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 1050 million

    Coût total (montant approximatif)

    EUR 1400 million

    Aspects environnementaux

    The project is expected to decrease the negative impacts associated with road traffic and have positive impacts on the environment thanks to the modal transfer to rail.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC/ or 2004/17/EC and Directive 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 21/11/2014

    Mots-clés correspondants

    Espagne Transports