Date de publication: 29 avril 2013
Promoteur – Intermédiaire Financier
TERNA - RETE ELETTRICA NAZIONALE SPALieu
Description
The Project consists of a multi-component investment programme aimed at reinforcing the Italian electricity transmission system. The programme indicatively encompasses 14 large transmission sub-projects located across several regions of Italy, including an electricity storage pilot project based on sodium sulfur stationary batteries.
Objectifs
The proposed Project aims to reduce congestion, improve the reliability and quality of supply and support the integration of renewable generation facilities in the Italian power system. A significant part of the investments is located in the country's southern regions which are convergence regions. By supporting the integration of renewable generation facilities, notably onshore wind, the project will also contribute to reducing CO2 emissions. Finally, operating activities related to grid applications of sodium sulfur stationary batteries could support innovation and technical development in the field of electricity storage.
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 570 million
Coût total (montant approximatif)
EUR 1160 million
Aspects environnementaux
By their technical characteristics some sub-projects of the programme fall under Annex I or Annex II of the EIA Directive. The impacts that can be typically expected for these sub-projects relate to visual impact, vegetation clearance, electromagnetic fields noise nuisance, birds’ collision and mortality and impact on sea-bed flora and fauna. Environmental impact studies have been carried out as applicable and mitigating and/or compensation measures will be applied as necessary.
Passation des marchés
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC/ and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Signé - 8/07/2013
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).