Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20120630
Date de publication: 22 octobre 2013

Promoteur – Intermédiaire Financier

TENNET TSO GMBH

Lieu

Description

Construct and maintain three separate offshore grid connections (HelWin1, SylWin1 and DolWin1) to the German Electricity Grid.

Objectifs

By developing offshore grid connections and linking wind farms to the German Electricity Grid, it helps the country to shift away from nuclear power generation. Moreover by supporting the integration of over 2.2 GW of offshore wind generation into the grid, the project will significantly contribute to reduce CO2 emissions.

Commentaires

The project cost is not disclosed as it is commercially confidential.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 500 million

Coût total (montant approximatif)

Not disclosed.

Aspects environnementaux

Underground/undersea cables and converter stations, both onshore and offshore, by virtue of their technical characteristics are neither listed under Annex I nor Annex II of the EIA Directive. Given the size of the links, however, the competent authorities requested detailed environmental studies including public consultation. Appropriate Assessments of impacts on biodiversity (Habitat and Birds Directive) have been carried out during all authorisation processes with close consultation of relevant National Park authorities. Details will be assessed during appraisal to verify compliance with the Bank’s environmental policy.

Passation des marchés

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Statut

Signé - 9/12/2013

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Énergie