Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120532
    Date de publication: 2 septembre 2013

    Promoteur – Intermédiaire Financier

    MINISTRY OF FORESTRY AND WATER WORKS

    Lieu

    Description

    Supporting forest rehabilitation, afforestation, erosion control and forest fire-fighting activities in Turkey through the Ministry of Forestry and Water Affairs.

    Objectifs

    The operation aims at providing specific support to the Strategic Plan of the Ministry of Forestry and Water Affairs, supporting the afforestation, forest rehabilitation, erosion control and forest fire-fighting activities of Turkey's General Directorate of Forestry for the period 2014-2016.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Not disclosed.

    Coût total (montant approximatif)

    Not disclosed.

    Aspects environnementaux

    Afforestation projects are included in Annex II of the EIA Directive, but rarely do competent authorities require a full EIA in the case of afforestation/reforestation of existing forestry land. The project will focus on afforestation, erosion control and soil rehabilitation works. It is likely to deliver multiple environmental benefits particularly climate change mitigation and adaptation and improved natural resource management, contributing to both EU and Turkish environmental policy objectives. Technical features of the project and relevant EIA procedures will be analysed during appraisal.

    Passation des marchés

    Tendering and subcontracting procedures for site preparation, planting, maintenance and other works will be examined during the appraisal process. These are subject to Turkey’s public procurement legislation ("PPL"), which is modelled on the EC Public Procurement Directives and is in line with these directives in several key aspects. Turkey’s public procurement system has significantly improved since the adoption of the PPL in 2002 and is currently seen as of a high standard.

    Statut

    Signé - 2/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Turquie Agriculture, pêche, sylviculture