Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120418
    Date de publication: 5 janvier 2015

    Promoteur – Intermédiaire Financier

    JP DIREKCIJA CESTA FEDERACIJE BOSNE I HERCEGOVINE

    Lieu

    Description

    Rehabilitation and safety improvements of part of the national road network in the Federation of Bosnia and Herzegovina (FBiH).

    Objectifs

    The project is expected to facilitate trade, develop tourism, support private sector development, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region.

    Commentaires

    The investment schemes composing the project are expected to be carried out over a five-year period from 2014 until 2019.
    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 103 million

    Aspects environnementaux

    If located in the EU, two of the investments would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore be subject to screening. In FBiH they fall under the EIA procedure stipulated by the Law on Environmental Protection of BiH. The promoter has already carried out the EIA studies for these schemes. Their content and compliance with the principles of the relevant EU directives on strategic environmental assessment (SEA), EIA and nature conservation will be verified during appraisal. All other investments fall outside of the scope of Annexes I and II of the EIA Directive; the compliance of this second group of investments with the principles of the relevant EU directives on SEA, EIA and nature conservation will also be verified during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that any procurement procedures related to the project are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 23/02/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bosnie-et-Herzégovine Transports