Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20120385
    Date de publication: 10 octobre 2012

    Promoteur – Intermédiaire Financier

    ASSOCIATED BRITISH PORTS

    Lieu

    Description

    Upgrade of container berths and marine access channel at the Port of Southampton to accommodate large container vessels

    Objectifs

    The project aims at providing the infrastructure needed to accomodate the current and next generation of ultra-large container ships which are expected to be deployed on the Far East-Europe routes.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 87 million (GBP 70 million)

    Coût total (montant approximatif)

    EUR 174 million (GBP 140 million)

    Aspects environnementaux

    The upgrading of berths 201-202 has been the subject of a full EIA, including environmental impact studies (EIS), biodiversity assessments, and public consultation. The EIS non-technical summary (NTS) has been provided to the Bank. EIA procedures for the marine access channel deepening and widening works are underway. Compliance with the SEA directive, the Water Framework Directive, climate change adaptation issues, the EIA process and status of authorisations, biodiversity assessment requirements, residual impacts of the project, as well as compensation measures and monitoring for the project will be reviewed during appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/17/EEC and Dir. 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 5/07/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Transports