Date de publication: 27 septembre 2012
Promoteur – Intermédiaire Financier
COMMUNAUTE URBAINE DE BORDEAUX (BORDEAUX URBAN COMMUNITY)
Lieu
Description
Third phase of work on the tramway network: extensions of existing lines (approx. 17 km), implementation of Médoc tram-train scheme (approx. 7 km), construction of a new line (approx. 10 km), partial services, expansion of service and acquisition of 47 trams.
Objectifs
To improve mobility in the urban community with a beneficial impact on quality of life and the environment.
Commentaires
Secteur(s)
Montant BEI envisagé (montant approximatif)
EUR 200 million
Coût total (montant approximatif)
EUR 1051 million
Aspects environnementaux
The project comes under Annex II to the EU Directive on environmental impact assessments (EIA), according to which the need to conduct a full EIA is determined on the basis of a case-by-case analysis by the competent authority. EIAs were carried out for all components of the proposed operation and obtained a favourable opinion from the competent authorities. A more detailed study of all the aspects covered by EU environmental directives, including EIA Directive 2011/92/EU, Habitats Directive 92/43/EEC and Birds Directive 79/409/EEC will be conducted during the project appraisal. Given that the operation is an investment programme made up of several components, compliance with the Strategic Environmental Assessment (SEA) Directive 2001/42/EC will also be examined during the evaluation.
Passation des marchés
The Bank will require the promoter to ensure that the contracts for the implementation of the project have been/are awarded in accordance with the relevant EU procurement legislation (Directives 2004/18/EEC and 2007/66/EEC) through the publication of notices of invitations to tender in the Official Journal of the European Union (OJEU) if required.
Statut
Signé - 21/12/2012
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).