Date de publication: 7 mars 2013
Promoteur – Intermédiaire Financier
JP AUTOPUTEVI REPUBLIKE SRPSKELieu
Description
Construction of a 2x2 76 km toll motorway from Banja Luka to Doboj in Republika Srpska, Bosnia & Herzegovina.
Objectifs
The project is a priority backbone motorway development for Republika Srpska as it connects two of its main cities. It also connects to Corridor Vc and is entirely located in Republika Srpska territory. It will contribute to trade and business improvements and support a dynamic private sector both within RS but also with the Federation of Bosinia and Herzegovina(FBiH) and Croatia and Serbia though Corridor Vc. The project contributes to the integration of the two Bosnian entities, RS and FBiH.
Commentaires
Secteur(s)
- Transports - Transports et entreposage
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 207 million
Coût total (montant approximatif)
EUR 565 million
Aspects environnementaux
The environmental and social impact is limited. A GAP analysis of the local ESIA was undertaken relative to EU standards and all necessary mitigating and compensatory measures included. No sensitive areas are located in the area of influence of the project.
Passation des marchés
The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Statut
Signé - 16/12/2013
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).