    Référence: 20110448
    Date de publication: 31 janvier 2012

    Promoteur – Intermédiaire Financier

    MUNICIPALITY OF CHISINAU

    Lieu

    Description

    Rehabilitation of selected primary and secondary streets and sidewalks in the city centre, as well as establishing integrated on-street parking infrastructure and the replacement of street lighting with modern energy efficient lights and automation and monitoring system on the rehabilitated streets.

    Objectifs

    The main objective of the project is to improve fluidity of transport in the centre of Chisinau by improving traffic conditions and parking organisation. By addressing the existing serious congestion issues, the project will reduce vehicle operating costs, save time and lower CO2 emissions. The project might also have a positive impact on public transport usage. In addition, the project will ensure that the City centre is sufficiently illuminated, while providing cost saving for the City and have a positive impact on the environment.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 10 million

    Coût total (montant approximatif)

    EUR 28 million

    Aspects environnementaux

    If located within EU, the project will likely fall under Annex II of the EIA Directive 85/337/EEC, as amended. The project implementation is limited to the urban area within the boundaries of the City and no sensitive ecological receptors or protected zones are affected. It is anticipated that the project will not have significant adverse social impacts to local communities or other project affected parties and no land is expected to be acquired for the implementation of the project as well as no involuntary resettlement or economic displacement likely to be triggered. Further environmental and social aspects will be detailed during appraisal.

    Passation des marchés

    The project is classified as public sector for procurement purposes. Goods, works and services financed under the Bank’s loan will be procured using the appropriate procedures in accordance with the EIB Guide to Procurement.

    A Project Implementation Unit (PIU) has been established within the City Transport Department and it will have overall responsibility for the procurement and implementation of the project. The PIU will be supported by experienced implementation consultant. The procurement aspects will be further detailed during appraisal.

    Statut

    Signé - 21/09/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Rep. De Moldova Transports