    Référence: 20110275
    Date de publication: 17 janvier 2012

    Promoteur – Intermédiaire Financier

    ADMINISTRACION NACIONAL DE ELECTRICIDAD

    Lieu

    Description

    The project concerns the construction of a 500kV high voltage transmission line between Villa Hayes and Yacyretá with an approximate length of 300km.

    Objectifs

    The purpose of the project is to reinforce and upgrade the power transfer capability of Paraguay’s transmission network and its interconnection with neighboring countries. The project will help meet the growing electricity demand by supplying electricity from a renewable energy source, thus supporting the EU priority target of climate change mitigation.

    Commentaires

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 75 million

    Coût total (montant approximatif)

    EUR 223 million

    Aspects environnementaux

    The guidelines of the international finance institutions involved and the national legislation require for this project an environmental and social assessment (ESIA). A consultant is currently preparing the first phase of this assessment defining line sections where resettlement would be needed. The ESIA process and its results will be reviewed, as well as the promoter’s capacity to implement and monitor the required impact mitigation measures in line with the Bank’s guidelines.

    Passation des marchés

    The procurement of the section to be financed by the Bank will be carried out in line with the requirements of the Bank’s Guide to Procurement.The rest of the contracts are expected be tendered internationally, in line with the rules of the IADB .The project’s procurement policy and strategy will be appraised.

    Statut

    Signé - 11/12/2013

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).