Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100683
    Date de publication: 13 février 2012

    Promoteur – Intermédiaire Financier

    Republic of Montenegro

    Lieu

    Description

    The project would contribute to repairing and reconstructing the major damage to the public infrastructure (roads, bridges, water supply, hydraulic infrastructure, etc.) caused by the exceptional rainfall and flooding of November and December 2010.

    Objectifs

    Re-establish the conditions for economic growth and sustainable development, prevent similar disasters by addressing key risks as well as supporting social cohesion and job creation.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 25 million

    Coût total (montant approximatif)

    EUR 30 million

    Aspects environnementaux

    As an official candidate country for membership to the European Union, the promoter is required to implement all the schemes in compliance with relevant EU environmental and social legislation and principles.

    Passation des marchés

    Procurement procedures will be consistent with the Bank’s Guidelines to Procurement.

    Statut

    Signé - 10/10/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Monténégro Transports Eau, assainissement