Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20100589
    Date de publication: 2 mai 2012

    Promoteur – Intermédiaire Financier

    The project promoter is a private Spanish multinational company that applies innovative technology solutions for sustainable development in the energy and environment sectors, generating electricity from the sun, producing biofuels, desalinating sea water and recycling industrial waste. The promoter is a market leader in most of these sectors, has an extensive track record and an international presence in over 70 countries across all continents. A South African pre-eminent development finance institution, whose role is to foster private sector development in South Africa, will jointly sponsor the project.

    Lieu

    Description

    Construction and operation of a greenfield solar power tower with a 50 MW net power-generating capacity.

    Objectifs

    Khi Solar One is a 50 MW steam receiver power tower concentrated solar power (CSP) plant with approximately two hours of steam storage and will have an overhead tie-line connection to the grid. The project will be located approximately 15 km south-west of the town of Upington in the Northern Cape province in South Africa.

    Commentaires

    This operation is covered by the EU Political Risk Guarantee for EIB loans outside the EU.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 332 million

    Aspects environnementaux

    If the project were located in the EU, it would fall under Annex II of the EIA Directive (85/337/EEC) as amended, requiring the competent national authority to determine the need for an Environmental Impact Assessment (EIA). Under South African Law, the project requires a mandatory EIA including initial scoping and public consultation. During appraisal, the Bank will ensure that the project complies with the Bank's principles and standards as regards environmental and social issues.

    Passation des marchés

    The project has followed private procurement rules and the main contractors and suppliers have already been selected. However, the South African power sector is not liberalised and access to the electricity market is only possible through specific tendering procedures. The Bank will appraise the procurement process followed to confirm compliance with the Bank's Guide to Procurement.

    Statut

    Signé - 5/11/2012

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Afrique du Sud Énergie