Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20100575
Date de publication: 3 mars 2011

Promoteur – Intermédiaire Financier

CITY OF YORK COUNCIL NORTH YORKSHIRE COUNTY COUNCIL

Lieu

Description

The Project concerns the design, construction, operation and maintenance of waste treatment facilities that will enable energy and materials recovery from residual waste generated in North Yorkshire and the City of York, England.

Objectifs

The project will contribute to meeting the region’s targets for diversion of biodegradable and other waste from landfills, complement up-stream efforts on recycling, and enable recovery of energy from waste.

Commentaires

Secteur(s)

  • Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

Montant BEI envisagé (montant approximatif)

GBP 152 million (EUR 178 million)

Coût total (montant approximatif)

GBP 320 million (EUR 373 million)

Aspects environnementaux

The project consists of waste treatment facilities that will enable recyclables and energy recovery from the residual waste stream. The facilities will be constructed on a site currently used for sand and gravel screening and vehicle storage, which is located adjacent to a landfill. The project will reduce the amount of waste that is disposed on landfills and it will enable recovery of energy and some recyclables from the residual waste.

Passation des marchés

Procurement for this project has been carried out according to UK PFI regulations. Following a competitive dialogue with short listed bidders, a preferred bidder was chosen in July 2010. The preferred bidder intends to implement the project through an EPC contract for the waste incinerator, and design-build-commissioning contracts and a separate civil and building works contract for the other project facilities.

Statut

Signé - 30/10/2014

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Royaume-Uni Déchets solides