Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20090602
Date de publication: 1 mars 2010

Promoteur – Intermédiaire Financier

Mekorot Enterprise & Development

Lieu

Description

A seawater reverse osmosis desalination plant, including an open seawater intake and a sea outfall for brine disposal.

Objectifs

The objective of the project is to produce at least 100 million m3 of potable water per year.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 120 million.

Coût total (montant approximatif)

Project cost has been currently estimated to be in the range of EUR 458 million. including contingencies and interest during construction.

Aspects environnementaux

Though not particularly mentioned in Annex 1 of Environmental Impact Assessment (EIA) Directive 97/11/EC Seawater Reverse Osmosis (SWRO) desalination plants require a full EIA. In the absence of an international Best Available Technique (BAT) standard for desalination projects best professional judgment adopting the definitions of BAT and Best Environmental Practices (BEP) as introduced by the European Integrated Prevention Pollution Control Directive (Directive 2008/1/EC), the Land-Based Sources (LBS) Protocol of the Mediterranean Action Plan, and applicable Israeli regulations will be applied.

The Environmental Impact Assessment (EIA) is available at :
Mekorot Development & Enterprise
No. 1 Karlibach st., floor no. 10
Tel Aviv, Israel
Tel: 972-3-6334500.
Review hours: 9:00-15:00 following prior coordination.
Contact person : Ms. Granit Ben Ezra or Mr. Nehemia Katabi.

Passation des marchés

The Engineering Procurement and Construction (EPC) and Operating & Maintenance (O&M) contract have been internationally and competitively tendered. Pending a positive review of the evaluation report this procedure follows international practices and is acceptable to the Bank.

Statut

Signé - 6/12/2011

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Israël Eau, assainissement