Date de publication: 4 septembre 2015
Promoteur – Intermédiaire Financier
SOFIA MUNICIPALITYLieu
Description
The project consists of the construction and commissioning of a new combined heat and power (CHP) plant for Sofia's district heating network operated by Toplofikacia utilising refuse derived fuel (RDF) to be produced at the municipality's new waste management facility. This would be the final phase of the integrated Sofia Municipal Waste project. The project is likely to be co-financed under the OP Environment during 2014-2020 and it is on the JASPERS action plan to support the prepration of the grant application.
Objectifs
The plant will combust refuse derived fuel (RDF), feed its electricity into the public grid, and provide heat to the district heating system of Sofia. It will partly replace heat generation in existing natural gas fired installations.
Secteur(s)
- Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Montant BEI envisagé (montant approximatif)
EUR 67 million
Coût total (montant approximatif)
EUR 161 million
Aspects environnementaux
The project concerns the construction and operation of a cogeneration plant processing more than 100 t/day of refuse derived fuel (RDF) from a mechanical biological treatment plant in Sofia. Hence the project is subject to Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EC and consequently requires a mandatory EIA. It falls also under the provisions of the Industrial Emission Directive 2010/75/EC requiring, among others, use of best available technology.
Passation des marchés
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC/ or 2004/18/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.
Statut
Signé - 21/12/2018
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).