Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20090545
    Date de publication: 4 septembre 2015

    Promoteur – Intermédiaire Financier

    SOFIA MUNICIPALITY

    Lieu

    Description

    The project consists of the construction and commissioning of a new combined heat and power (CHP) plant for Sofia's district heating network operated by Toplofikacia utilising refuse derived fuel (RDF) to be produced at the municipality's new waste management facility. This would be the final phase of the integrated Sofia Municipal Waste project. The project is likely to be co-financed under the OP Environment during 2014-2020 and it is on the JASPERS action plan to support the prepration of the grant application.

    Objectifs

    The plant will combust refuse derived fuel (RDF), feed its electricity into the public grid, and provide heat to the district heating system of Sofia. It will partly replace heat generation in existing natural gas fired installations.

    Secteur(s)

    • Déchets solides - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 67 million

    Coût total (montant approximatif)

    EUR 161 million

    Aspects environnementaux

    The project concerns the construction and operation of a cogeneration plant processing more than 100 t/day of refuse derived fuel (RDF) from a mechanical biological treatment plant in Sofia. Hence the project is subject to Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EC and consequently requires a mandatory EIA. It falls also under the provisions of the Industrial Emission Directive 2010/75/EC requiring, among others, use of best available technology.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC/ or 2004/18/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

    Statut

    Signé - 21/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Bulgarie Déchets solides