Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20090510
Date de publication: 1 décembre 2009

Promoteur – Intermédiaire Financier

Republic of Hungary represented by the National Development Agency

Lieu

Description

The project consists of the extension and the modernisation of public urban transport networks – mainly tramway lines and trolleybus lines – and rolling stock acquisition in three medium-sized Hungarian cities under the Hungarian Transport Operational Programme.

Objectifs

The proposed project will improve the quality of the public transport services in the cities of Szeged, Miskolc and Debrecen and will increase the attractiveness of public transport services, thus reducing the impact of urban transport on the environment.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 46.3 million

Coût total (montant approximatif)

EUR 400 million

Aspects environnementaux

The project is part of the Hungarian Transport Operational Programme that was subject to a Strategic Environmental Assessment in compliance with the SEA Directive 2001/42/EC. The project is a composite operation including the construction of new tramway lines in the towns of Szeged, Miskolc and Debrecen that fall under Annex II of the EIA Directive 85/337/EEC as subsequently amended. For both Miskolc and Debrecen schemes, the Competent Authority decided that an EIA was not required on the basis of preliminary environmental studies. In the case of Szeged scheme, a full EIA was carried out.

Passation des marchés

The Promoter is subject to and follows EU procurement procedures (Directives 2004/17/CE and 2004/18/CE), including publication in the OJEU. All contracts have to be tendered through regular and transparent procedures, in compliance with the European Union legal framework, leading to the selection of the most favourable offers, from both economic and technical standpoints.

Statut

À l'examen - 1/12/2009

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Hongrie Transports