    Référence: 20090078
    Date de publication: 2 juin 2009

    Promoteur – Intermédiaire Financier

    Dublin Airport Authority plc
    Feargal O’ Reilly, Group Head of Financial Reporting

    Lieu

    Description

    The construction and fit out of a new terminal building, a new connecting pier, as well as development of associated utilities, aircraft parking stands and taxiways, and campus roads at Dublin Airport. The new terminal will ultimately have the capacity to handle up to 15 million passengers per annum.

    Objectifs

    Dublin Airport is an international connecting point on the TEN-T, making it eligible for finance under one of EIB's priority lending objectives. The project is part of the masterplan for Dublin Airport and is aimed at reducing passenger and aircraft congestion and accommodating long-term capacity needs.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to EUR 300 million.

    Coût total (montant approximatif)

    In the region of EUR 600 million.

    Aspects environnementaux

    The project is classified under Annex II of Council Directive 85/337 as amended by Directive 97/11/EC and 2003/35/EC, thus requiring a decision by the competent authority whether or not a formal Environmental Impact Assessment (EIA) is required. A formal EIA process was, in fact, required and was carried out.

    The local area plan for the airport, which was adopted by Fingal County Council, was accompanied by a Strategic Environmental Assessment, in the context of which, the EIA was carried out. Planning approval was eventually granted following a period of public consultation.

    Passation des marchés

    With the project over 50% complete, the majority of works, goods and services have been procured. The Promoter follows EC Directives on procurement and so the Bank will review during appraisal what type of procedures were adopted for the main work packages and that they were advertised in the Official Journal consistent with the Directives.

    Statut

    Signé - 10/11/2009

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Irlande Transports