Date de publication: 13 juillet 2010
Promoteur – Intermédiaire Financier
Edison Stoccaggio S.p.A.
Lieu
Description
The project consists of the conversion of onshore depleted gas fields into underground gas storages (UGS). The project involves drilling wells, and installing associated processing facilities and pipeline connections.
Objectifs
Natural gas storage facilities play an important role in providing flexibility and security of gas supply in a sector characterised by large variations in demand and rigid supply. The project will provide for additional withdrawal capacity during peak demand periods as well as increased working gas capacity. It is a trans- European energy network of Common Interest (Decision 1364/2006/EC - Annex III).
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 270 million.
Coût total (montant approximatif)
Up to EUR 540 million.
Aspects environnementaux
Given its technical characteristics the project falls under the Annex I of the EC EIA directive (85/337 and amendments). It is understood that the promoter has undertaken EIAs for some of the relevant sites. To be verified during appraisal.
Passation des marchés
The procurement for the project will follow the requirements of EU directive 2004/17/EC as transposed into Italian legislation.
Statut
Signé - 10/12/2010
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).