Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20080441
    Date de publication: 21 juillet 2009

    Promoteur – Intermédiaire Financier

    Tramwaje Warszawskie Sp. z o.o.

    Lieu

    Description

    The project consists of a set of interventions targeted at modernising and improving the quality of the Warsaw tramway network and services, including some lines extensions and rehabilitation, plus the acquisition of more than 180 new trams, replacing old ones and integrating the existing fleet to serve the new extensions and increase the level of service.

    Objectifs

    The project is part of the strategy for the improvement of mobility and public transport in Warsaw, and should improve the quality of service (in terms of frequency, speed, connections, comfort and reliability) for public transport users, alleviating private cars pressure and the related problems of pollution, thus improving the quality of the urban environment.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to 1 bn PLN (ca. EUR 217 million).

    Coût total (montant approximatif)

    Total project cost is estimated at 2 bn PLN (ca EUR 435 million).

    Aspects environnementaux

    Poland, as a Member State, is obliged to follow the relevant EU rules in relation to the environmental impact of projects (namely SEA, EIA and Habitat/Natura 2000 Directives). The project is a multi-scheme investment loan, with medium-sized investments. Rolling stock acquisition falls out of the scope of the EU EIA Directive, while lines extension and rehabilitation fall under Annex II of the same Directive, according to which the need to carry out an EIA is decided on a case by case analysis. Details will be checked at appraisal stage, when the relevant specific information for each scheme is available and analysed.

    Passation des marchés

    The promoter is a public entity subject to EU public procurement regulations. The Bank will require the promoter to ensure that contracts for the implementation of the Project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EEC) with parallel publication of tender notices in the EU Official Journal, as and where appropriate. All the details will be checked at appraisal stage.

    Statut

    Signé - 15/09/2010

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports