Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20070245
    Date de publication: 16 juillet 2007

    Promoteur – Intermédiaire Financier

    Walsall College
    St Paul’s Street
    Walsall WS1 1WY
    United Kingdom
    Contact Name: Jatinder Sharma

    Lieu

    Description

    The project consists of the construction and equipping of a new college facility opposite the existing main site in the town centre. The existing main site, which is in need of upgrading, is to be sold and leased back for three years while the new facility is under construction.

    Objectifs

    The project is a core part of an ongoing investment programme at Walsall College to expand, improve and rationalise its infrastructure, in order to provide the student population with improved quality of education and to expand accommodation facilities.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to GBP 9.6 million. (under an existing Education Framework Facility with Barclays Bank plc, London)

    Coût total (montant approximatif)

    Up to GBP 64.4 million.

    Aspects environnementaux

    Council Directive 97/11/EEC on Environmental Impact Assessment (EIA), as amended by 2003/35, does not specifically mention facilities for higher education, but these could in some circumstances be seen as urban development projects. (thus falling under Annex II of the Directive) The project by virtue of its nature, size and location appears unlikely to have a significant effect on environment. The basis for requesting (or not) an EIA by the competent authorities, the local planning and approval process and actual/possible significant impacts on protected flora and fauna (Habitats’ and Birds’ Directives) will be verified during project appraisal.

    Passation des marchés

    English Further Education colleges, including Walsall College, are required by the Learning and Skills Council to follow EU procurement guidelines.

    Statut

    À l'examen - 16/07/2007

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Santé