Recherche Fr menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20070181
Date de publication: 9 août 2007

Promoteur – Intermédiaire Financier

Telefónica S.A.

Lieu

Description

Telefónica’s investments include the geographic and capacity expansion of its existing mobile broadband UMTS network in Spain, as well as the extension of its GSM network using the 900 MHz frequency (E-GSM), mainly in rural areas.

Objectifs

The project fits well within two of the EU priorities: supporting regional development and promoting innovation investments for the development of the Information Society.

On one hand, 76% of the Spanish territory consists of convergence areas under the new Convergence and Competitiveness Objectives 2007-2013 set up by the Commission. Having the project of a nation wide coverage, its regional interest is thus clear as further provision of cost-efficient broadband mobile telecom infrastructure will help to encourage economic development. In addition, the E-GSM part of the project has a particularly dedicated coverage of rural areas and large transport infrastructures deriving from the obligations set up by the Spanish telecom regulator CMT for using this frequency spectrum.

On the other hand  the project concerns the expansion of a last generation broadband mobile telephony network, which is in line with Community policy and Council recommendations for the development of the Information Society as well as with the Bank’s RDI priority initiative.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 500 million.

Coût total (montant approximatif)

EUR 1900 million.

Aspects environnementaux

Investments in mobile telecom projects (including base stations, transmission systems and OSS) do not fall under Annex I or II of Directive 85/337 EC as amended by Directives 97/11/EC and 2003/35 EC. GSM/UMTS systems have limited environmental effects, apart from the visual impact of base station towers. Other impacts can be mitigated by appropriate construction and operation measures. Potential health risks from electromagnetic radiation are under study at an international level.

The promoter has an Environmental Management System to identify activities that impact on the environment and promote corrective actions under a specific environmental policy. Full environmental details will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives).

Passation des marchés

The promoter is a private company not operating in the Utilities sector. Spain also falls under the latest communication 2004/C115/03. The promoter is therefore neither covered by the EU Directives 93/38/EEC nor by the EU Directive 2004/17/EEC on procurement. The effectively used procurement procedures will be assessed during appraisal.

Statut

Signé - 3/12/2007

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Espagne Télécom