    Référence: 20070082
    Date de publication: 13 juin 2007

    Promoteur – Intermédiaire Financier

    Office National de l’Electricité.

    Lieu

    Description

    Creation and extension of hydropower schemes (in particular: construction of a pumped storage power station in Abdelmoumen; extension of the Afourer pumped storage power station; construction of a hydropower plant at Tillouguit) plus the installation of remote management systems at existing hydropower plants.

    Objectifs

    To optimise the operation of ONE’s power generation plant and reduce production costs by storing power generated at off-peak times in order to meet the requirements of a heavy load curve at peak times.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 150 million.

    Coût total (montant approximatif)

    EUR 335 million.

    Aspects environnementaux

    The hydropower schemes under the project would fall under Annex II of the Environmental Impact Assessment Directive 85/337/EEC as amended by Directives 97/11/EC and 2003/35/EC if located within the EU. This would leave it to the competent national authority to determine the requirement for an EIA based on the screening criteria specified in Annex III of the same directive.

    According to national legislation for such a project, the environmental authorities require the promoter to prepare an environmental impact assessment (EIA), including an environmental action plan. The high voltage power lines connecting the schemes to the grid will probably also be subjected to an EIA. Studies will be carried out during appraisal to verify that the project is in line with EU environmental and social procedures, subject to local conditions and law.

    By virtue of substituting for alternative fossil fuel-fired generation and thereby contributing to a reduction in greenhouse gases, the hydropower project may be eligible for registration under the Kyoto Protocol.

    Passation des marchés

    The Bank will ensure that the promoter implements the project in accordance with the EIB’s Guide to Procurement.

    Statut

    Signé - 27/12/2007

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Maroc Énergie