Référence: 20060409
Date de publication: 16 octobre 2006

Promoteur – Intermédiaire Financier

AEM Torino S.p.A., Turin’s municipal electricity, gas and district heating company

Lieu

Description

The project covers a 3-year investment programme expanding the district heating network in the centre of the city of Turin. Main investment components are the construction of a new power integration and back up plant (255 MWth), 15 km of heat transport network and 90 km of heat distribution network.

Objectifs

The proposed investments are aimed at substituting electricity, oil and gas fed space heating with heat provided via a central plant and a district heating network, thus reducing losses and improving the safety and reliability of gas, heating supply network allowing for significant energy savings and, as an additional benefit, improving compliance to meet new environmental and technical standards.

Commentaires

District Heating.

Secteur(s)

Montant BEI envisagé (montant approximatif)

Up to EUR 80 million.

Coût total (montant approximatif)

Up to EUR 160 million.

Aspects environnementaux

By virtue of their technical characteristics, project schemes fall under Annex II of the Environmental Directive 85/337/EEC (amended by Directives 97/11/EC), leaving it to the regional competent authority to decide whether an EIA would be required. The details of the environmental procedures followed, including possible mitigation measures, will be reviewed during appraisal.

Passation des marchés

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Utilities Directive 93/38/EC as amended by Directive 17/2004/EU) with parallel publication of tender notices in the Official Journal of the EU as and where appropriate. The promoter’s procurement procedures will be further evaluated during appraisal including OJEU notices for the project components and national compliance with EU Directives.

Statut

À l'examen - 16/10/2006

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).