Date de publication: 22 septembre 2006
Promoteur – Intermédiaire Financier
Hamburg Stadtentwässerung (HSE)Lieu
Description
The project concerns the reconstruction and upgrading of sewer systems.
Objectifs
The project aims at the reduction of environmental disturbances for Hamburg’s residents and the urban traffic system by adopting a proactive approach in sewer network reconstruction and rehabilitation in line with HSE’s continuously up-dated 20-year rehabilitation programme. The project contributes to reduce the water table pollution by repairing broken sewers and to lower the probability of traffic disruptions and subsidence of buildings by avoiding the collapse of sewer segments.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to EUR 160 million.
Coût total (montant approximatif)
Ca. EUR 400 million.
Aspects environnementaux
The promoter carries out an appropriate environmental assessment of each sub project, where necessary, identifying and applying mitigation and compensation measures to protect the environment, in line with EU and national legal requirements, notably those on EIA and nature conservation.
Passation des marchés
EU procurement regulations are observed by the promoter.
Statut
Signé - 8/12/2006
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).