Date de publication: 15 mai 2006
Promoteur – Intermédiaire Financier
Network Rail Infrastructure Limited
40 Melton Street
London NW1 2EE
Contact - Mr. T. Winter, Head of Treasury Operations
Lieu
Description
Infrastructure investments to provide capacity enhancement, operational improvements and to ensure continued safety across the rail network. Core elements include investment in the Trent Valley section of the West Coast Main Line, remodelling of Rugby and Nuneaton stations, and power supply upgrades in South London, Wessex, Sussex and Kent.
Objectifs
Improved capacity to meet growing demand for rail transport, particularly four-tracking of sections of the Trent Valley route to remove a major bottleneck and facilitating the introduction of new rolling stock in the South East through power supply upgrading. Improved operational efficiency and safety, particularly from infrastructure replacement and remodelling, and signalling development and replacement.
Commentaires
Railway infrastructure.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to GBP 300 million
Coût total (montant approximatif)
Approximately GBP 1 200 million
Aspects environnementaux
NRIL follows a corporate environmental policy which includes applicable national and EU legislation. The procedures will be verified during appraisal.
Passation des marchés
NRIL is subject to EU procurement Directives. The application of the directives will be verified during appraisal.
Statut
Signé - 9/11/2006
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).